Circular Economy
9 April 2020
The NSW EPA Civil Construction Market Program is one of the few waste sector related grant programs currently open in Australia.
Applications close in a week and reopen in July so get in touch with MRA now to discuss your options.
Recycling
10 December 2018
With landfill levies in NSW at $140.20/t you would think that sorting of commercial waste would be more common than it is. Less than 5% of the Commercial and Industrial (C&I) waste in NSW is put through a processing plant to recover the valuable materials. In other words, less than 120,000t of the 5.5 MT that is generated is put through a processing plant. There are no dedicated C&I sorting facilities in other States (and landfill levies are lower).
Recycling
26 September 2018
According to the 2016 National Waste Report, Commercial and Industrial waste (C&I) represents 20 MT of the 53 MT of waste generated in Australia (or 40% of generation). It also represents 34% of all waste sent to landfill (or 7.2MT out of 21MT) and achieves a 64% recovery rate compared to C&D (64%) and MSW (51%).
Not bad in the scheme of things.
Waste
20 April 2016
By Mike Ritchie – Director, MRA Consulting Group On 16 February 2016, the Australian population reached 24 million people. Waste generation rates are a function of population growth, the level of urbanisation and per capita income[i] and Australians now produce about 50 million tonnes of waste each year, averaging over 2 tonnes per person. There […]
Policy
8 December 2015
Voluntary action by every individual helps to grow recycling rates; an extra milk bottle in the recycling bin; installing a home composting system, all contribute. Australia leads the world in household recycling rates. In the business sector most of the economically viable streams are already being recycled (cardboard, paper, metals and plastic) although there is […]
Waste
3 August 2015
Inside Waste (April 2013) published an article by MRA on Weight Based Charging (WBC) titled ‘Wake the Sleeping Giant on C&I’. It argued Weight Based Charging for commercial waste, would likely assist in achieving Australia’s C&I resource recovery targets. WBC provides waste generators with a direct price signal, equating waste generation to costs. At present […]
Landfill
4 June 2015
By Mike Ritchie Landfill gate fees typically cover costs of operation, overheads, mobile plant and equipment, labour, depreciation costs of roads and buildings and other fixed assets and profit. But the costs (and therefore the gate fee), also need to include 30-50 year post closure management, long term monitoring and reporting, and importantly replacement of […]
Licencing
4 June 2015
Important changes were recently introduced by the Protection of Environment Operations (Waste) Regulation 2014. These have considerably reduced the threshold levels for the holding of an Environmental Protection Licence (EPL) for certain waste activities e.g. processing, recovery and storage of waste. The new requirements mean that some existing waste businesses that were not previously required […]
Recycling
2 June 2015
MRA has wrapped up its 2014-2015 ‘Bin Trim Business Grants’ project, which is part of the NSW Government Waste Less Recycle More $465.7 million program. Along with 26 other Bin Trim providers, we have visited 8,000+ small to medium enterprises (SME) across NSW. SMEs are responsible for 45 per cent of commercial and industrial (C&I) […]
Recycling
1 May 2015
A recent case in the NSW Land and Environment Court has highlighted the discord between NSW’s planning laws and the environmental protection laws, which could impact the way that waste and recycling processers are approved and regulated. After much advocacy by the waste and recycling sectors, the Government in 2007 introduced the State Environmental Planning […]
Licencing
30 March 2015
The NSW EPA’s risk-based licensing system commences on 1 July 2015. The goal of Risk Based Licensing is to allocate the maximum EPA resources to those sites that pose the greatest environmental risk and less to those that do not. The EPA intends to conduct an environmental Risk Assessment for each licenced site in NSW […]
Waste
10 March 2015
Australia generates 48 MT/year of waste (latest National Waste Data Report 2014). In the period 1997-2012 our population rose by 22% but waste generation increased by 145%. There are more of us and we generate more waste per person, each year. On the positive side, recycling is growing at a faster rate and since 2005 […]